Home > About Geoquip Marine > Track Record > OWF Geotechnical Site Investigation, Japan

OWF Geotechnical Site Investigation, Japan

0m
Maximum water depth
0m
Maximum drilling depth
0 days
Project duration

Geoquip Marine was contracted to perform a geotechnical site investigation with the heave compensated drilling rig GMTR150 on board the vessel Poseidon-1, as part of an offshore wind farm development, located on the east coast of Japan. Geoquip Marine safely delivered reliable high-quality PCPT data to the Client. A team of experienced Geoquip Marine onshore geotechnical engineers was responsible for the timely delivery of the final field report presenting data required for the engineering design of a planned offshore wind farm.

PROJECT DETAILS

Offshore wind farm site investigation.

INDUSTRY

DATE STARTED

1 February, 2021

TESTS PERFORMED

PCPT.

EQUIPMENT USED

Poseidon-1 Offshore Windfarm Japan

Poseidon-1 + GMTR150

LOCATION

East coast of Japan (Kamisu)