Geoquip Marine was contracted to perform a geotechnical site investigation with the heave compensated drilling rig GMTR150 on board the vessel Poseidon-1, as part of an offshore wind farm development, located on the east coast of Japan. Geoquip Marine safely delivered reliable high-quality PCPT data to the Client. A team of experienced Geoquip Marine onshore geotechnical engineers was responsible for the timely delivery of the final field report presenting data required for the engineering design of a planned offshore wind farm.
PROJECT DETAILS
Offshore wind farm site investigation.
INDUSTRY
DATE STARTED
1 February, 2021
TESTS PERFORMED
PCPT.
LOCATION
East coast of Japan (Kamisu)