Home > About Geoquip Marine > Track Record > Wind Farm Site Investigation offshore Massachusetts, USA

Wind Farm Site Investigation offshore Massachusetts, USA

0m
Maximum water depth
0m
Maximum drilling depth
0 days
Project duration

Geoquip Marine has completed a geotechnical site investigation off the Massachusetts coast, USA.  High quality undisturbed samples were recovered and reliable PCPT data recorded utilising the GMTR120 heave compensated drill rig which is permanently installed onboard the Dina Polaris.  The objectives of this geotechnical investigation were to improve the legacy geological and geotechnical understanding of the wind lease area through the definition of vertical and lateral site soil variations.

PROJECT DETAILS

Offshore geotechnical site investigation.

INDUSTRY

DATE STARTED

1 October 2020

TESTS PERFORMED

Sampling and PCPT.

EQUIPMENT USED

LOCATION

Offshore Massachusetts, USA.