Following a rapid mobilisation onto Solstad’s Normand Baltic, the GMR302 again performed excellently during difficult weather conditions to complete this offshore geotechnical investigation for the renewable energy sector.
The scope of work comprised PCPT, SPCPT and high quality undisturbed sampling in boreholes over 115m deep. The data will enable optimised foundation design for this prestigious wind farm development.
Another geotechnical campaign completed in Taiwan with zero HSE and Environmental incidents. Geoquip Marine; Safely Delivering Reliable Data.